TENANT IMPROVEMENT ELECTRICAL

Tenant improvement electrical contractor for commercial build-outs

We carry the electrical scope on tenant improvement work — capacity, distribution, branch wiring, lighting, controls and low-voltage — sequenced so the gear arrives on time, the walls close on schedule and every inspection clears.
Home  /  Tenant Improvement Electrical Contractor
WHAT WE OWN ON A TI

The electrical scope on a tenant improvement, start to finish

A tenant improvement is a remodel inside a building that is already energized, and that changes what the electrical work actually is. You are feeding a new suite from a service someone else sized, through a meter bank or house panel you share with other tenants, under a landlord work letter that spells out what you may touch and when you may shut it off.

We take that scope end to end: verifying the available capacity, designing or reviewing the distribution, releasing the long-lead gear, roughing in power, lighting and low-voltage, coordinating the ceiling with mechanical and plumbing, and carrying the permit and inspection sequence through to final sign-off.

The work we do before the first box is mounted is what keeps the job on schedule. Load calculations, panel space, lighting power allowances and the equipment schedule all get confirmed against the drawings first, because any one of them can change the gear — and the gear is almost always the longest lead item on the job.

What comes with the contract

SCOPE OF WORK

What a TI electrical contractor is responsible for

Six blocks of work that show up on nearly every commercial tenant improvement, whether the space is office, retail, medical or food service.

Capacity and service

Confirming what the existing service, meter position and feeder can actually deliver, and planning an upgrade or a new meter when the new load does not fit. This is settled before anything else is priced.

Distribution and panels

New panelboards, transformers, feeders and disconnects sized to the load, with room left for the growth the tenant has told us about — and labeled panel schedules that match what is actually installed.

Branch power

Receptacles, dedicated equipment circuits, workstation and furniture feeds, and floor boxes laid out to the furniture and equipment plan rather than a generic spacing.

Lighting and controls

Fixtures, emergency and exit lighting, occupancy and daylight controls, and the dimming the energy code requires, commissioned so the controls actually work on day one.

Low-voltage and data

Pathways, backboxes and cabling for data, voice, access control, security and AV, coordinated with the tenant’s IT vendor so nothing is roughed in twice.

Permits and inspections

Plan submittal, response to plan-review comments, and the inspection sequence from rough-in and cover through final — tied to the certificate of occupancy date.

HOW THE JOB RUNS

The order the work goes in

Electrical starts earlier than most people expect and finishes last. The front end is about capacity and gear; the back end is about power-up and inspection.
01

Walk the space and verify the service

We open the electrical room, read the nameplates, check the meter bank and trace where the suite is fed from. What the drawings assume and what is actually installed are compared before a number is given.
02

Run the load and price line by line

The load calculation tells us whether the existing service works. Distribution, branch power, lighting, controls and low-voltage are then broken out separately, with allowances marked.
03

Permit and long leads in parallel

Drawings go in for plan review while panels, transformers, switchgear and specialty fixtures are released, so the permit clock and the lead times run at the same time instead of back to back.
04

Rough-in and cover inspection

Conduit, boxes, feeders and branch wiring are installed and inspected before the walls and ceiling close. Ceiling coordination with ductwork, sprinklers and plumbing happens here.
05

Set gear and make the tie-in

Panels are set and terminated, and the tie-in to the building service is scheduled as a planned shutdown, usually after hours, with the notice the building requires.
06

Trim, energize and final

Devices and fixtures trimmed, circuits tested, controls commissioned, panel schedules finalized, and the final electrical inspection signed off for occupancy.
COMMON QUESTIONS

Tenant improvement electrical questions

If your question is not here, call and ask for an estimator.

Both. On smaller suites we often contract with the tenant or landlord directly. On larger build-outs we usually work as the electrical subcontractor under a general contractor, with a written scope letter and submittals on the specification’s schedule.

We find that out at the start, not at rough-in. If the existing service or feeder cannot carry the new load, we lay out the options — a larger feeder, a new meter position or a service upgrade through the utility — with the cost and schedule of each.

Panelboards, transformers and switchgear are built to order, and lead times move with the market. That is why we release them off preliminary drawings once the load is confirmed, rather than waiting for the permit.

Yes. Shutdowns, tie-ins and any work that affects other tenants are scheduled outside business hours with the notice the building requires. We carry that cost in the estimate rather than raising it later.

Yes. Commercial energy codes limit lighting power and require occupancy, daylight and time-based controls in most spaces. We design or verify the lighting against the code your jurisdiction has adopted and commission the controls before final.

Get the tenant improvement electrical priced

Send the drawings or a scope summary and your target date. We turn most estimates around in three business days.