Low-voltage and data cabling contractor for tenant improvements

Data, voice, access control, security cameras and AV all need pathways, power and cabling that arrive with the rest of the build-out. We install the infrastructure and coordinate with the tenant’s IT team so the network is ready on move-in day.
Home  /  Low-Voltage and Data Cabling Contractor
READY ON DAY ONE

Low-voltage that is planned with the electrical, not after it

Low-voltage is often treated as an afterthought, bought late from a separate vendor who shows up after the ceiling is closed. The result is cable pulled through finished walls, missing backboxes and a network that is not ready when the tenant moves in.

We plan it with the electrical from the beginning. Backboxes and conduit stubs go in during rough-in, cable tray and J-hooks are coordinated in the ceiling with the other trades, and the telecom room gets the dedicated power, grounding and cooling it needs.

Whether we install the complete structured cabling system or only the pathways for the tenant’s own IT vendor, the point is the same: every outlet, camera, card reader and display has a route and a box before the drywall goes up.

What we coordinate with IT

SCOPE OF WORK

Low-voltage systems we install

Six systems that share pathways and need to be coordinated together.

Structured cabling

Copper horizontal cabling to every outlet and access point, terminated, labeled and tested, with a fiber or copper backbone where the space needs it.

Telecom rooms

Racks, cable management, dedicated circuits and grounding for the IT room, with the space planned around the equipment going into it.

Pathways

Conduit, cable tray, J-hooks and sleeves through rated walls, installed and firestopped so cable can be added later without opening walls.

Access control

Backboxes, door hardware power and cabling for card readers and electrified locks, coordinated with the door hardware supplier.

Security cameras

Camera locations, cabling and power over Ethernet planned for coverage, with the network switch sized for the cameras.

Audio-visual

Floor boxes, wall boxes, conduit and power for displays, conference systems and sound, placed to the AV designer’s layout.

HOW THE JOB RUNS

How low-voltage fits the build-out

The timing that keeps cabling from becoming a late-stage problem.
01

Collect the IT requirements

We meet with the tenant’s IT lead early to confirm counts, locations, cabling standard and who supplies the active equipment.
02

Rough-in with the electrical

Backboxes, conduit stubs and sleeves are installed during rough-in, before walls close.
03

Pull and terminate

Cable is pulled once the ceiling pathways are complete, then terminated in the telecom room and at each outlet.
04

Test, label and document

Every cable is tested and labeled, and the test results and outlet map are handed to the tenant’s IT team.
COMMON QUESTIONS

Low-voltage questions

If your question is not here, call and ask for an estimator.

We install the cabling, racks and pathways. Switches, firewalls and wireless controllers are usually supplied and configured by the tenant’s IT provider, and we coordinate the handoff.

It depends on the tenant’s standards and expected equipment life. We install to the category the IT team specifies and test to that standard.

Sometimes, if it is a current category, tests clean and runs to the right locations. Old cable that will not be used is generally required to be removed, and we price that separately.

Yes. We can provide pathways, boxes and power for their devices, or install the cabling ourselves to their specifications.

Because boxes and pathways have to be installed before the walls and ceiling close. Adding them later means cutting finished drywall, which costs time and money.

Plan your low-voltage with the build-out

Send the floor plan and your IT requirements. We turn most estimates around in three business days.