BUILT TO THE SPEC

Reading Division 26 before the price, not after award

Division 26 is the electrical section of the specification format most architects and engineers use. It sets the materials, methods, manufacturers, testing and documentation for the electrical work, and on larger or institutional projects it carries real cost that never appears on the drawings.

Required manufacturers, wiring methods, witnessed testing, extended warranties, spare parts and commissioning support are all written into the spec. A contractor who prices from the drawings alone will miss them, and the gap comes back as a dispute after award.

We read the division before pricing and state in our bid which sections we have included. Where a specified product has a lead time or availability problem, we raise it with a priced alternative early, through the proper substitution process, rather than after the submittal is rejected.

Division 26 sections that commonly carry cost

SCOPE OF WORK

What a specification-driven project requires

Beyond the installation, these are the deliverables Division 26 usually calls for.

Spec review

A section-by-section read of Division 26 and the related general requirements before pricing, with inclusions stated in the bid.

Submittals

Product data and shop drawings organized to the spec’s section numbers, complete on the first submission wherever possible.

Substitutions

Formal substitution requests with equivalent products when a specified item has a lead time or availability problem.

Testing

Insulation, continuity and functional testing as the spec requires, with witnessed tests scheduled with the engineer.

Commissioning support

Working with the commissioning agent on lighting controls and other systems, and correcting items they find.

Closeout deliverables

As-builts, test reports, O&M manuals, warranties, spare parts and owner training delivered as the spec lists them.

HOW THE JOB RUNS

A specification-driven job, step by step

How we keep Division 26 from becoming a source of disputes.
01

Read the division before pricing

General requirements and technical sections are reviewed so the bid carries the testing, warranties and deliverables the spec requires.
02

Submit to the spec

Submittals follow the spec’s organization and turnaround, with substitutions requested early and in writing.
03

Install and test

Work is installed to the specified methods, and required tests are performed and documented as the job goes.
04

Commission and close out

Commissioning items are resolved and the closeout package is assembled section by section against the spec.
COMMON QUESTIONS

Division 26 questions

If your question is not here, call and ask for an estimator.

It is the electrical division of the standard construction specification format. It covers materials, installation methods, testing and closeout for the electrical work on a project.

The drawings show what goes where. The specification sets what it is made of, who can make it, how it is installed and tested, and what must be delivered at the end. Much of the cost lives there.

Yes, through the substitution process the spec defines. We submit equivalent products with the documentation the engineer needs to approve them.

Yes. Lighting controls in particular are frequently commissioned by a third party, and we schedule our work and corrections around their process.

Division 27 covers communications and Division 28 covers electronic safety and security. We can carry both with the electrical, or coordinate with separate contractors who hold them.

Send the drawings and the spec

Share the full bid set including Division 26. We return a bid that states exactly which sections we have included.