Commercial electrical subcontractor for general contractors

Most of our work is under a general contractor. We give you a scope letter you can level against other bids, submittals on the specification’s turnaround, a foreman who shows up to coordination meetings and closeout documents before the final pay application.
Home  /  Commercial Electrical Subcontractor
WHAT GCS NEED FROM A SUB

An electrical sub that does not become the critical path

A general contractor does not need an electrician who is merely competent. They need one whose bid is complete, whose gear arrives when it was promised, who calls inspections without being chased and who turns in closeout documents without three reminders.

Our bids are written to be leveled. Every inclusion and exclusion is spelled out — temporary power, fire alarm, low-voltage, trenching, patching, utility fees — so you are comparing the same scope across bidders and not discovering a gap after award.

On site, our foreman attends coordination meetings, works the ceiling out with the mechanical and sprinkler trades before anyone hangs pipe, and keeps the look-ahead schedule current. When something threatens the schedule, you hear about it early, with options.

What you get with our bid

HOW WE WORK WITH YOU

What we handle as your electrical sub

The administrative side of the job matters as much as the installation.

Leveled bids

Scope letters written line by line so the GC can level them against other electrical bids without guessing what was left out.

Submittals

Product data and shop drawings for gear, fixtures and devices, submitted on schedule and resubmitted promptly when comments come back.

Coordination

Ceiling and wall coordination with mechanical, plumbing, sprinkler and low-voltage trades, so conflicts are solved on paper instead of in the field.

Schedule and inspections

A look-ahead that tracks gear delivery and inspections, with inspection requests made without being chased.

Safety and compliance

Lockout procedures, energized-work controls, and the insurance certificates and documentation general contractors require.

Closeout

As-builts, panel schedules, test reports, warranties and O&M manuals delivered with the final inspection, not weeks after.

HOW THE JOB RUNS

From bid to closeout

The milestones a general contractor can hold us to.
01

Bid with a clear scope letter

We walk the site when possible and return a scope letter that states what is in, what is out and what is carried as an allowance.
02

Buy out and release gear

Once awarded, submittals for long-lead gear go first so the equipment can be released as soon as it is approved.
03

Coordinate and install

Our foreman coordinates the ceiling and walls with the other trades, and rough-in follows the framing without holding it up.
04

Inspect, energize and close out

Inspections are called on schedule, the suite is energized and tested, and the closeout package goes in with the final.
COMMON QUESTIONS

Questions from general contractors

If your question is not here, call and ask for an estimator.

We can bid from plans, but on tenant improvements a site walk catches existing conditions that change the price. If a walk is possible, we take it.

We call them out in the scope letter. Items such as motor connections, fire alarm, low-voltage and control wiring are commonly split between trades, so we state exactly which side of each line we are on.

Yes. We can work with your engineer on value engineering during design, or provide design-build electrical with engineered drawings where the jurisdiction requires them.

A confirmed load and an approved gear submittal. We will ask for approval on the gear before the rest of the submittals because it has the longest lead time.

As-built drawings, typed panel schedules, test reports, warranties, operation and maintenance manuals and any required commissioning documentation.

Send us the bid package

Share the drawings, specifications and bid date. We confirm our scope and return a leveled number on your schedule.